Better Light. A Brighter Tomorrow.
For Installers & Integrators - Norvablind trade partnership
For installers & integrators

Built to be installed properly

Technical support, commissioning guides and controls that integrate cleanly, so an installation goes in once and works.

Pre-programmed

Limits set at the factory

Open protocols

Zigbee, Matter, dry contact

Wiring diagrams

Per product and interface

Technical support

Direct line to our team

Less time on site, fewer return visits

Every shade leaves the factory with its limits set and its operation cycle tested against a unit schedule. On site the work is mounting and pairing, not configuring motor end limits one window at a time.

When a project needs shading inside an AV or BMS system, we supply the interface, the wiring diagram and a commissioning sequence rather than leaving you to work it out at handover.

For Installers & Integrators - Norvablind trade partnership

Factory-set limits

Electronic limits are programmed and tested before dispatch, with a unit schedule supplied.

Integration interfaces

Dry contact and RS-485 for control systems, alongside wireless for stand-alone use.

Documentation

Wiring diagrams, commissioning sequence and troubleshooting flow for each product.

Support that answers

A named technical contact and a direct channel for site questions.

See it. Test it. Specify it.

Choose a sample approach that fits your evaluation.

Please allow for design discretion. Final colour, fabric and performance are confirmed with the selected sample.

Fabric and finish selection for a specification

From material board to window detail.

Details make the difference

Designed into the specification.

Fabric & finish

Consider weave, texture, colour and light together.

Proportion & fit

Reveal dimensions, mounting depth and stack height.

Visible components

Headbox, brackets, remote and accessory finishes.

Everyday interaction

How the room will be used and operated each day.

A clear path forward

From schedule to handover.

01

Send the schedule

Share window sizes, reveal details and controls.

02

Confirm the interface

We specify motors, interfaces and power.

03

Factory pre-commission

Limits set and cycles tested against your schedule.

04

Install and hand over

Pair, test and complete the handover sheet.

Resources & support

Technical resources

What partners get

Support built around your business

  • Factory-set motor limits
  • Commissioning sheets per unit type
  • Dry contact and RS-485 interfaces
  • Spare motors and carriers
  • Technical training and webinars
  • Priority support for active sites
Installer & integrator enquiry

Send us the installation.

Share the window schedule, the control requirement and the reveal details you are working with.

A conversation, not a commitment.

Share your requirements and we will confirm the product options and next steps for your enquiry.

Common questions

Yes. Limits are electronic and can be reset from the remote or app in under a minute. The factory setting is a starting point, not a fixed value.

An interface module, the wiring diagram for your control system, and the commissioning sequence. We confirm the interface against your control specification before dispatch.

Yes. Motors, carriers, batteries and controls are all available as spares so a unit can be repaired rather than replaced.

Optional
Warm neutral shade fabric with directional daylight
A brighter tomorrow, together

Let's build brighter spaces.

Talk to our team about the partnership path that fits your business.

Get a Quote Call

Request received

Thank you. A member of our team will respond within 1-2 business days.